PT.
CITRA PANJI MANUNGGAL
|
|
LEMBAK - PUSRI GAS PIPELINE
Client : PT. MULADI, PERTAMINA Location : Lembak, South Sumatra Year : 1993 Scope : Construction and Commissioning 90 km of gas pipeline Lembak gathering station to PUSRI plant consisting of 22" - 20 km. 24" 20 km (including 8 km swamp and one river crossing), 14" - 50 km (including 15 km swamp) |
![]() |
|
![]() ![]() |
|
![]() |
Current Project: